Termination Devices

Hubbell Power Systems, Inc. offers a variety of CHANCE® special termination devices and standard accessories.  The project and application will dictate which product is used or specified.

 

New Construction Pile Caps

NC Pile Caps are installed as a termination device to the top of a CHANCE® Helical Pile Installation.  Once the pile installation has been completed, the load is transferred to the structure.

C150-0467_rotated

New Construction Cap for compression and uplift:
C150-0467

It is recommend that a registered Professional Engineer conduct the design

It is recommended that a registered Professional Engineer conduct the design.

 

Thread Bar and Guy Adapters

Thread bar and guy adapters are used are also used as a termination device to the top of a CHANCE® Helical Pile Installation.  Once the pile installation has been completed, the load is transferred to the structure.

 C110-0026_thread-bar-adapter

C110-0514_thread-bar-adapter

 

For preliminary design guidelines, please refer to section 4 of the Technical Design Manual or contact your area CHANCE® Distributor for any special requirements or questions.