Under Footer Pier

Atlas Resistance®
Standard and Modified 2-Piece Systems

  • Use for lifts up to 4".
  • All 2-piece pier systems include:
    • Pier bracket.
    • Top pier platform.
    • 14 linear feet of pier pipe (including the starter section).
    • "M" designates one modified sleeve included.

Order Separately: Two pier pins (two Grade 8 bolts for 4-1/2" pier) and pier shims. Each pier requires a minimum of four anchor bolts. NOTE: Anchor bolts not supplied by Chance® Civil Construction

Standard finish is all mill steel (except AP-2-UF-3500[PA] series, which has "Flow Coat" corrosion protection on the pier pipe, standard). Specify finish within brackets [*]

Hubbell Power Systems All contents Copyright© 2001 - Hubbell Power Systems, Inc. All rights reserved. Because Hubbell has a policy of continuous product improvement, we reserve the right to change design specifications without notice.
Terms of Use | Contact Us | Site Map | A subsidiary of Hubbell Incorporated
myHubbell.com HeliCAP Distributors