Description of the Building: This two story, four family condominium was built on a steel reinforced, concrete foundation consisting of a perimeter footing, stem wall and a floor slab. The structure is of wood frame construction with an exterior covering of wood siding.

Distress Observed: Differential settlement of the perimeter walls as the structure was being built caused distress. Cracks appeared in the slab and foundation stem walls. The movements were causing problems with finishing the interior of the building.

Cause of the Problem: The engineers determined that the settlement was the result of consolidation of inadequately compacted fill soil. Of equal or greater significance was the determination that the plumbing trench located at the southwestern side of the structure had not been compacted. This area suffered the greatest settlement with movements of four inches!

Repaired By: Mays Construction Specialties, Inc.
            Grand Junction, Colorado
Average Drive Force: 50,250 pounds
Average Lift Force: 37,780 pounds
Average Factor of Safety: 33% Above Lift Force, 125% Above Lift to Ultimate Capacity
Number of Piers:        16 Amount of Lift: Up to 4 in. Average Depth: 9 ft.

Atlas Piers installed

 

RAPID INSTALLATION!

Small excavations permit the installation of the Atlas Resistance Piers. This means no heavy equipment and minimal disruption to soil near the structure. The piers are driven to a suitable load bearing stratum using quiet and smooth hydraulics.

These photographs show the Atlas Resistance Piers installed along the northwest side of the structure. Notice that the footing has been carefully notched to place the load over the pier.


Atlas Resistance Piers installed

Structure - before restoration

SUCCESS! These photographs show the southwest side of the structure before and after restoration. The structure is gently returned to as close as possible to original elevations using a series of hydraulic rams connected together for a uniform lift.

Structure - after restoration

North Star Telluride

 

ATLAS RESISTANCE PIERS INSTALLATION SUMMARY

Pier Installation Log

 

Pier
Section

Location and Driving Force

Pier #1 Pier #2 Pier #3 Pier #4 Pier #5 Pier #6 Pier #7 Pier #8
Sect. #1 6,632 0 0 0 4,148 0 4,145 0
Sect. #2 7,461 6,632 9,948 29,015 19,896 24,870 27,357 20,725
Sect. #3 58,030 49,740 49,740 49,740 49,740 49,740 49,740 49,740

Analysis of Lifting, Driving, and Ultimate Force

                                                                                 

Factor Of Safety

Results

Location Lifting
Force lb.
Driving
Force lb.
Ultimate
Cap. lb.
Working
F. S.
Ultimate
F. S.
Approx.
Lift –in.
Depth to
Bearing
Pier #1 18,100 58,030 85,000 3.20:1 4.70:1 1 / 2 " 10’ – 6"
Pier #2 43,300 49,740 85,000 1.15:1 1.96:1 1-3/4" 8’ – 6"
Pier #3 43,300 49,740 85,000 1.15:1 1.96:1 2-7/8" 9’ – 8"
Pier #4 43,300 49,740 85,000 1.15:1 1.96:1 4" 10" – 6"
Pier #5 43,300 49,740 85,000 1.15:1 1.96:1 2-3/4" 8’ – 0"
Pier #6 31,900 49,740 85,000 1.56:1 2.66:1 1-1/2" 9’ – 0"
Pier #7 25,800 49,740 85,000 1.93:1 3.29:1 1-1/2" 9’ – 0"
Pier #8 41,200 49,740 85,000 1.21:1 2.06:1 1" 10’ – 0"

INSTALLATION SUMMARY-continued

Pier Installation Log

Pier Location

Location and Driving force – pounds

  Pier #9 Pier #10 Pier #11 Pier #12 Pier #13 Pier #14 Pier #15 Pier #16
Sect. #1 33,160 0 23,212 24,041 24,870 25,699 16,580 8,290
Sect. #2 49,740 19,896 49,740 49,740 35,647 34,818 33,160 26,528
Sect. #3   49,740     49,740 49,740 49,740 49,740

 

Analysis of Lifting, Driving, and Ultimate Force

 

INSTALLATION SUMMARY-continued

Location Lifting Force – lb. Driving Force – lb. Ultimate Force – lb. Working F.S. Ultimate F. S. Appox.
Lift–in.
Depth to Bearing
Pier #9 46,400 49,740 85,000 1.07:1 1.83:1 1" 6’ – 6"
Pier #10 46,400 49,740 85,000 1.07:1 1.83:1 1" 10’ – 0"
Pier #11 46,400 49,740 85,000 1.07:1 1.83:1 1" 7’ – 0"
Pier #12 30,900 49,740 85,000 1.61:1 2.75:1 3 / 4" 7’ – 0"
Pier #13 30,900 49,740 85,000 1.61:1 2.75:1 3 / 4" 10’ – 0"
Pier #14 30,900 49,740 85,000 1.61:1 2.75:1 3 / 4" 8’ – 6"
Pier #15 41,200 49,740 85,000 1.21:1 2.06:1 3 / 4" 8’ – 6"
Pier #16 41,200 49,740 85,000 1.21:1 2.06:1 1 / 2" 9’ – 0"
   